IT relocation services for servers, server rooms and offices

Planned, packed, moved and tested for businesses in Hong Kong, Singapore, mainland China, the United States and the United Kingdom.

Moving an office, a comms room or a few racks between data centres is a short window of real risk. We plan the move, power down in the right order, pack every device against a written asset list, re-rack and re-cable it at the new site, and test it before your staff come back on Monday.

From US$1,800per project. Fixed-price statement of work (SOW)About HK$14,100 or S$2,307. Larger moves are priced from published hourly rates; see the price breakdown below.
Since 2007managed IT services
360+long-term clients
120+office IT setups completed
5markets: HK, SG, CN, US, UK
Two Brocent engineers pack server rack rails and cabling into a foam-lined carton during an IT relocationOn site
Video: Brocent engineers packing rack rails and cabling on a relocation job.
01 · Scope

What are you relocating?

Most moves are a mix of these four. Pick the one that matters most and we start the plan there.

Packed IT cartons on trolleys in an open-plan office ready for an office IT move
Office IT relocation

Office IT move

IT equipment relocation for the whole floor: desks, laptops, printers, Wi-Fi, meeting rooms and the network that joins them.

  • Desk-by-desk labelling and a seat map
  • Network, Wi-Fi and printers live before staff arrive
  • Day-one floor support at the new office
Plan an office move
Server room relocation finished: servers, NAS and switches re-racked with patch cabling
Server room relocation

Server room and comms room

On-premises servers, storage, firewalls, switches and UPS in a small room or a few cabinets.

  • Shutdown and power-on order agreed with you
  • Rack layout, power and cooling checked at the new room
  • Backup verified before anything is switched off
Move a server room
Engineer stretch-wraps a server rail kit before a data centre move
Data centre relocation

Racks between data centres

Colocation racks moving between facilities, or old kit coming out while new kit goes in.

  • De-rack, transport and re-rack by the same team
  • Cabling recorded before and rebuilt after
  • Retired kit to IT asset disposal with data destruction certificates
Move racks
Cross-city and cross-border

Multi-site and cross-border moves

Two or more sites, or one office moving between Hong Kong, mainland China and Singapore.

  • One project manager across every site
  • Local engineers at each end
  • Your freight forwarder handles customs; we plan the IT
Plan a multi-site move
02 · Process

Our server and office IT relocation process

Six steps on one timeline. Each step shows what our engineers do and what we need from you, so nothing falls between the two.

  1. T−8 wkSurvey

    01 Survey and inventory

    Brocent
    • Walk both sites: rack space, power, cooling, cable routes
    • Build the IT asset list from what is really there
    • Agree a move priority and a rollback plan
    You provide
    • Floor plans and the lease dates
    • Building contacts at both sites
    • Who signs off the plan
    Before a server relocation, an engineer traces patch cables in the rack to record connections and take an IT asset inventory
    Before the move: tracing patch cables and recording every connection
  2. T−4 wkPlan

    02 Move plan and building approvals

    Brocent
    • Write the cut-over plan, hour by hour
    • List lift, access and work-time needs for each building
    • Order or move internet lines with the carriers
    You provide
    • Submit building applications as the tenant
    • Approve the move window
    • Tell staff what to pack
  3. T−1 wkPrepare

    03 Backups and labelling

    Brocent
    • Check that a recent backup restores
    • Label every device, cable and port
    • Pre-build the network at the new site where it is ready
    You provide
    • Freeze changes to systems
    • Confirm the backup owner
  4. Day 0Power down

    04 Shut down, de-rack and pack

    Brocent
    • Power down in the agreed order
    • De-rack and pack against the asset list
    • Foam, cartons and stretch wrap for every unit
    You provide
    • Building access for the evening or weekend
    Engineer kneels to pack IT equipment into a foam-lined carton
    Packing against the asset list
  5. Day 0Move

    05 Transport and handover

    Brocent
    • Count items out and count them in
    • Supervise loading and unloading
    • Keep fragile and high-value units with the engineers
    You provide
    • Your moving company for furniture and bulk boxes
    Engineer pushes a trolley of packed IT cartons along an office corridor
    Moving packed IT through the building
  6. Day 1–5Rebuild

    06 Re-rack, test and support

    Brocent
    • Re-rack, re-cable and power on in order
    • Test network, systems and user access
    • Engineers on the floor on the first working day
    • Updated asset list and test report
    You provide
    • A few users to test key apps
    • Sign-off on the test report
    After the server relocation: switches, patch panels, servers and NAS re-racked (re-racking complete) and cabled in the new cabinet
    After the move: re-racked and re-cabled in the new cabinet

What you receive at the end of the move

  • Site survey notes for both sites
  • Hour-by-hour cut-over and rollback plan
  • Updated IT asset list with serial numbers
  • Rack diagrams and cabling records
  • System test report signed by your team
  • Time and material record for the job
03 · Checklist

IT relocation checklist

Tick items as you go. Your ticks stay in this browser. Copy or print the list to share with your team or building manager.

Eight weeks beforeT−8 weeks

Four weeks beforeT−4 weeks

One week beforeT−1 week

Move dayDay 0

First day backDay 1

First weekDay 2–5

04 · Risks

Data centre and server relocation risks, and how we control them

A physical move needs the power off. These are the risks that cause long outages, and what we do about each.

RiskHow we control itYour part
A system does not come backWritten power-on order, a test plan per system and a rollback plan agreed before the moveName who decides on rollback
Data lossWe check that a recent backup restores before anything is switched off, using your backup systemKeep the backup owner on call
Missing or mixed-up partsEvery device, cable and port is labelled; items are counted out and counted in against the asset list—
Damage in transitFoam and cartons for every unit, stretch-wrapped rail kits, supervised loading; insurance checked before transport and written into the SOWConfirm your asset values
Internet not readyLines ordered when the new address is signed; we chase the carrier and test on the daySign the carrier order
Building blocks the workWe list lift, loading bay, access and work-time needs for both buildingsSubmit the tenant applications

We do not promise zero downtime for a physical move. We agree the window with you and plan to finish inside it.

05 · Cost

IT relocation cost: how our price is built

Three published numbers make up every relocation quote. Use the estimator to see what your hours cost before you call us.

Fixed-price projectUS$1,800from, per project

Survey, plan, move and test written into one SOW at one price. Most office and server-room moves are quoted this way.

Professional services pricing
Rack and stackUS$400from, per rack

Racking, cabling and power-up in a data centre by our field engineers.

On-site engineer hours
MarketDesktopServer / networkServer, USD
Hong KongHK$543HK$597US$76.23
SingaporeS$89S$98US$76.45
Mainland ChinaRMB¥379RMB¥417US$62.37
United StatesUS$94.50US$103.95US$103.95
United Kingdom£70£77US$103.40
Per hour, Level 1, next business day, prepaid.All dispatch rates

Estimate your relocation hours

Default: a typical small server-room move in your market. 2 server engineers, 2 days on site (16 hours each), weekday, within 30 km, 2 racks to re-rack. Two days on site count as two visits, and travel is charged per visit (the default is within 30 km, so no travel hours). Change any value.

Market
Engineer type

When
Distance from our office
Currency

Local prices use the exchange rates on our price board.

Your estimate

Server / network rate, Hong KongHK$597/hr
Billable hours per engineer: 16 on site + 0 travel, ×116 h
Labour for 2 engineer(s)HK$19,104
Rack and stack: 2 × from HK$3,135HK$6,270
Planning estimate
HK$25,374before tax

A fixed-price SOW starts from HK$14,100 (US$1,800) per project. When a SOW is signed, its price replaces this estimate.

Estimates use our published rates only. They do not include building charges, moving company fees, new hardware or carrier fees.

Send this estimate

  • On site, the minimum is 2 hours per engineer. After that we round up to whole hours.
  • No travel charge within 30 km. 30–50 km adds 2 hours. Over 50 km is quoted.
  • Weekday evenings (18:00–22:00) are 1.5×. Late nights and weekends are 2×. Public holidays are 3×.
  • Travel hours for 30–50 km are charged at the same time-of-day multiplier as the work.
  • Carrying a server, network device or large spare by hand adds 1 token (heavy part transport).
  • Dispatches between 18:00 and 21:00 also carry a night travel surcharge (at most 2 tokens under our token rules). Both apply to an evening job: travel time at the evening multiplier, plus the surcharge. Final amounts depend on your requirements and supplier prices. Token rules
  • Prepaid IT token hours can be used for relocation work.
06 · Markets

IT relocation by market

The same process and price rules in five markets. On-site rates differ by market.

IT office relocation in Hong Kong

Our 15+ Hong Kong engineers work from our Kwun Tong office and cover Hong Kong Island, Kowloon and the New Territories. For an IT office relocation in Hong Kong we plan around each building's rules for after-hours work, goods lifts and loading bays, and we schedule the IT office move for an evening or a weekend so staff do not lose a working day. When you choose a data center relocation vendor in Hong Kong, ask who works at each end. With us it is one team: it de-racks at the old facility and re-racks at the new one. Office IT relocations here often run alongside Microsoft 365 changes, as two of the cases below show.

Server / network engineer HK$597/hrProject from ≈HK$14,100
IT support in Hong Kong

Office IT relocation in Singapore

Singapore is Brocent's global headquarters. The office at Chin Swee Road has an on-site warehouse, and more than 12 of our engineers are based in Singapore. Building management in Singapore, often an MCST, sets the hours and rules for after-hours work, so we list what each building needs early and plan the office IT relocation around it. Server relocations and office IT moves follow the same six steps as everywhere else, and we test the network before staff return. As a server relocation company headquartered here, we put a written cut-over plan into every Singapore SOW. On-site work is charged at our published Singapore rates shown here.

Server / network engineer S$98/hrProject from ≈S$2,307
IT support in Singapore

Server relocation in mainland China

Brocent started in Beijing in 2007. Our mainland coverage centres on Beijing, Shanghai, Guangzhou, Shenzhen and Hangzhou, with an asset and spare-parts hub in Shanghai. We move server rooms and racks between mainland sites, and between Hong Kong and the mainland together with your freight forwarder. Mainland office buildings often ask for a work plan and a staff list before work starts, and carriers schedule line moves on their own timetable, so we start both early. One of the cases below covers server retirement and migration across labs in Shanghai and Hong Kong.

Server / network engineer RMB¥417/hrProject from ≈RMB¥12,000
IT services in China

Data center relocation services in the United States

Brocent Americas Inc., a Delaware-registered entity, runs US projects through our USCA Service Centre. Delivery is remote-first: the survey review, the hour-by-hour plan and the system checks are coordinated remotely, and on-site work is dispatched through the USCA network when a visit is needed. Token on-site visits are booked for the next business day at our published US rates, drawing on Brocent's global network of more than 2,400 registered engineers. For data center relocation services in the US you get the same written cut-over and rollback plan as in Asia.

Server / network engineer US$103.95/hrProject from US$1,800
IT support in the US

Server relocation services in the United Kingdom

We do not have an office or a legal entity in the UK. UK clients contract with our Hong Kong company or our Singapore headquarters, and delivery is coordinated from our Warsaw EMEA Regional Service Centre, opened in April 2024. On-site work is carried out by vetted local engineers and partner companies that we scope, dispatch and quality-check, at our published UK rate with a 2-hour minimum per visit. Token on-site visits are scheduled for the next business day. You deal with one Brocent project manager and receive one signed work report.

Server / network engineer £77/hrProject from ≈£1,345
IT support in the UK
07 · Cases

Relocation and migration projects we have delivered

Published client cases. Names are withheld; numbers are as reported on our case studies page.

Data centre · FinanceFebruary 2021

Financial client, Hong Kong Equinix IBX: old kit out, new kit in

37servers decommissioned
6weekend days
  • Decommissioned 37 HP DL380 units and HP switches
  • Racked and stacked new Cisco UCS, firewall and Nexus switches
  • ITAD with certified data destruction; function test and commissioning report
Read the case
Multi-site · Manufacturing2021–2023

Global textile certification body: Shanghai and Hong Kong labs

37legacy servers retired
2sites
  • New DELL servers, EMC storage and VMware
  • Data migration and end-user migration
  • Retired servers through ITAD with certified data destruction
Read the case
HQ move · Finance2026

Hong Kong fintech: three Microsoft 365 tenants merged during an HQ move

180users
3→1tenants
  • Mailbox, SharePoint and Teams moved in stages
  • No email or Teams downtime across the cut-over weekend
  • On-site cut-over checks funded with IT token hours
Read the case
After the move · Retail2026

Hong Kong retail chain: clean-up after an HQ relocation

2→1tenants
4 hon-site SLA kept
  • Two Microsoft 365 tenants merged after the move
  • 4-hour on-site SLA kept through the relocation window
  • Audit reports delivered the same week as cut-over
Read the case
08 · FAQ

IT relocation FAQ

Questions we hear in almost every survey.

How much do IT relocation services cost?

A fixed-price relocation project starts from US$1,800. Racking in a data centre starts from US$400 per rack. Larger moves are built from our published on-site rates, for example HK$597 an hour for a server or network engineer in Hong Kong, with evening, weekend and holiday multipliers. You get a fixed SOW price after a site survey.

How long does a server or data centre relocation take?

Plan for about eight weeks from survey to move for an office, so internet lines and building approvals are ready. The move itself usually fits an evening or a weekend. Larger data centre work runs in phases: one financial client's 37-server refresh ran across 6 weekend days.

Can you move servers with zero downtime?

Not for a physical move: servers must be powered off to travel. We keep the outage inside an agreed window, test before staff return and have a rollback plan. If a service must stay up, we plan a temporary or cloud arrangement before the move.

Do you work evenings and weekends?

Yes, most moves happen then. Weekday evenings are charged at 1.5 times the hourly rate, late nights and weekends at 2 times, and public holidays at 3 times. For an evening dispatch with travel, the travel time is charged at the same multiplier and an evening travel surcharge is added separately; final amounts depend on your requirements and supplier prices.

Who deals with building management and the goods lift?

We list what each building needs: work times, lift and loading bay bookings, access cards. The tenant usually submits the applications; we coordinate with building management on the day at both sites.

When should we order new internet lines?

As soon as the new address is signed. Lead times depend on the carrier and the building. We place or chase the order with you and test the lines on move day.

Is our data safe during the move?

Before anything is switched off we check that a recent backup restores, using your backup system. Every device is labelled and counted in and out. Kit you retire can go to our IT asset disposal service with data destruction certificates.

What if equipment is damaged?

We pack every unit in foam and cartons and keep high-value units with our engineers. Insurance is checked before transport, and cover and liability are written into the SOW.

Do you move furniture and boxes too?

We are an IT relocation company, not a removals firm. Our engineers handle the IT. Your moving company handles furniture and bulk boxes, and we coordinate with them and your furniture supplier on the day.

Can you move IT between cities or countries?

Yes. One project manager runs every site, with our engineers at each end. Your freight forwarder handles shipping and customs; we plan the shutdown, packing and rebuild. Servers, firewalls and other equipment with encryption can fall under strategic goods or import and export controls when they cross a border. Whether a permit is needed depends on the equipment, so check the official sources below with your forwarder.

Do you cover Singapore, the US and the UK?

Yes. Singapore is our headquarters. Brocent Americas Inc. runs US projects. We have no UK office; UK on-site work is done by vetted partners at our published rates.

What do you need from us to quote?

Both addresses, the move date, the number of desks, a list of servers and network devices (or a rack photo), and any building rules. We then survey and send a fixed SOW.

What happens to equipment we do not move?

It can go straight to IT asset disposal: collection, data destruction with certificates and recycling, booked in the same plan.

We have our own IT team. Why use you?

Your team keeps the business running while we run the move: planning, labour, packing, logistics and the rollback plan. Your team stays the decision-maker.

Can we pay with IT token hours?

Yes. Prepaid token hours cover on-site and project work, including relocations, at the same time-of-day rules.

Official sources for cross-border moves

Rules depend on your equipment and route. These are the official pages your forwarder will work from.

Tell us about your move

Answer six questions and we will reply with a survey date and a fixed-price plan. Nothing is sent until you press the button.