Global Textile Certification Organisation — DELL R750 / EMC ME5024 / VMware Lab Build, Migration & 37-Server ITAD Across Shanghai & Hong Kong
Post-acquisition lab IT infrastructure modernisation across Shanghai and Hong Kong—deploying DELL R750 servers, EMC ME5024 storage, VMware virtualisation, Cisco networking, and Palo Alto firewalls, migrating data and EUC estates, and decommissioning 37 legacy HP servers with certified ITAD data destruction.
37
Legacy HP Servers Retired
2 Sites
Shanghai & Hong Kong Labs
VMware
DELL R750 + EMC ME5024
100%
Certified ITAD Destruction
EXECUTIVE PROJECT SUMMARY
As part of a business acquisition expansion from February 2021 through April 2023, a world-leading textile and apparel certification organisation engaged Brocent to design and implement complete laboratory IT infrastructure across Shanghai and Hong Kong. With Brocent Hong Kong governing programme architecture and Hong Kong site delivery—and BROCENT Group affiliate entities executing Shanghai lab construction, migration, and asset removal—the engagement deployed DELL R750 servers, EMC ME5024 storage, VMware virtualisation, Cisco switching, and Palo Alto firewalls, migrated production data and EUC users, and retired 37 legacy HP servers with certified ITAD data destruction.
Senior vCIO · Infrastructure & Wireless
Equinix IBX Data Centres · Structured Cabling · Ekahau Wireless Architecture
LAB INFRASTRUCTURE MODERNISATION & CERTIFIED ITAD MATRIX
End-to-end compute, network, migration, and disposal gates across Shanghai and Hong Kong
Compute, Storage & VMware
Network & Perimeter Security
Data & EUC Migration
Decommission & Certified ITAD
| Programme Stream | Target / Legacy Scope | Execution Standard | Audit Evidence |
|---|---|---|---|
| Compute, Storage & VMware | DELL PowerEdge R750 + EMC ME5024 + VMware virtualisation | Redundant HA cluster, multipath storage & burn-in validation | VMware cluster design pack, SAN multipath & health logs |
| Network & Perimeter Security | Cisco campus/lab switching + Palo Alto NGFW firewalls | Lab-instrument VLAN isolation & strict perimeter rulesets | As-built network diagrams & Palo Alto policy baseline |
| Data & EUC Migration | Production lab databases, file shares & acquired EUC fleet | Phased weekend cutovers with pre/post checksum verification | Signed migration UAT & EUC cutover completion register |
| Decommission & Certified ITAD | 37 legacy HP physical servers across Shanghai & Hong Kong | Serial-verified unrack, chain-of-custody & certified erasure/destruction | Serialised Certificates of Data Destruction & ITAD manifest |
IT MANAGER EVALUATION & AUDIT BENCHMARKS
Accredited Certification-Lab Modernisation & Chain-of-Custody ITAD Controls
MASSIVE PHYSICAL CONSOLIDATION
37 Legacy HP Servers Consolidated Onto DELL R750 + EMC ME5024
Retiring 37 ageing physical hosts slashed rack power, cooling strain, and hardware failure risk while unlocking VMware snapshot and high-availability capabilities.
LAB-SAFE MIGRATION DISCIPLINE
Zero Disruption to Accredited Testing Operations
Phased weekend migrations validated LIMS applications, instrument interfaces, and EUC logins before legacy systems were retired.
HARDENED POST-M&A PERIMETER
Cisco Switching + Palo Alto Firewalls Standardised
Brought newly acquired Shanghai and Hong Kong laboratory networks under one clean VLAN segmentation and firewall security policy.
AUDITABLE END-OF-LIFE CLOSURE
Certified Data Destruction on All 37 Retired Servers
Client brand test results cannot risk exposure on discarded drives; serial-tracked ITAD certificates closed compliance risk cleanly in both jurisdictions.
01 · PROJECT CONTEXT & CHALLENGES
What the client started with and needed to achieve
LAB EXPANSION FOOTPRINT
Shanghai & Hong Kong · Post-Acquisition Lab Consolidation
Accredited textile and apparel testing laboratories operating LIMS systems, analytical instruments, and confidential brand test records across two Greater China hubs.
DELIVERY & GOVERNANCE MODEL
Brocent HK + Shanghai Onsite via BROCENT Group Affiliates
Single two-year modernisation programme (Feb 2021 – Apr 2023) combining Hong Kong delivery with BROCENT Group affiliate engineering and certified ITAD logistics in Shanghai.
TECHNICAL & COMPLIANCE MANDATE
DELL/EMC/VMware · Cisco/Palo Alto · 37-Server Certified ITAD
Consolidate 37 legacy HP servers onto a modern VMware/DELL/EMC stack behind Palo Alto firewalls while guaranteeing zero data leakage during legacy server disposal.
KEY CHALLENGES & TRIGGERS
- Replacing 37 ageing physical HP servers across acquired textile testing laboratories in Shanghai and Hong Kong without interrupting accredited lab reporting or client sample testing
- Designing and commissioning a consolidated DELL R750, EMC ME5024, VMware, Cisco, and Palo Alto architecture spanning both Hong Kong and Mainland China regulatory boundaries
- Executing audited data migration, EUC migration, physical server decommissioning, and certified ITAD data destruction under strict international certification-body confidentiality rules
02 · DELIVERY WORKFLOW & ARCHITECTURE
Layered reference topology — select any zone or stage
Engineered and deployed modern DELL PowerEdge R750 hosts paired with EMC PowerVault ME5024 shared storage running VMware virtualisation in both Shanghai (via BROCENT Group affiliates) and Hong Kong, replacing sprawling physical workloads with resilient HA clusters.
FIELD EXECUTION SNAPSHOTS
Three-stage visual delivery walkthrough
DELL R750, EMC ME5024, VMware, Cisco & Palo Alto commissioning
Built redundant DELL PowerEdge R750 compute clusters, EMC PowerVault ME5024 shared storage, VMware virtualisation, Cisco switching, and Palo Alto firewalls across Shanghai (via BROCENT Group affiliates) and Hong Kong.
03 · IMPLEMENTATION NARRATIVE
How our engineers executed and verified this engagement
Post-Acquisition Lab Discovery & Target Architecture (Feb–May 2021)
Brocent audited acquired laboratory server rooms in Shanghai (via BROCENT Group affiliates) and Hong Kong, cataloguing 37 legacy HP servers, lab software dependencies, and network bottlenecks to finalise the DELL R750, EMC ME5024, VMware, Cisco, and Palo Alto blueprint.
DELL/EMC/VMware Cluster & Cisco/Palo Alto Network Deployment
Engineers installed and commissioned DELL R750 compute hosts, EMC ME5024 storage arrays, VMware virtualisation clusters, Cisco switches, and Palo Alto firewalls across both sites—validating failover and backup paths before workload cutover.
Phased Lab Data Migration & Regional EUC Cutover (2022)
Production laboratory data, virtualised workloads, and EUC workstations were migrated in controlled weekend waves with full checksum and application UAT verification, keeping certification throughput uninterrupted.
37-Server Decommissioning & Certified ITAD Closure (Q1–Apr 2023)
Once all workloads ran stably on the new VMware clusters, Brocent and BROCENT Group Shanghai affiliates unracked all 37 legacy HP servers and executed certified ITAD data destruction, closing the programme in April 2023 with full serialised certificates.
04 · PRACTICAL RISKS & MITIGATION
4 issues that typically go wrong—and how we prevented them
Laboratory Accreditation Disruption During Legacy HP Server Migration
Built parallel DELL R750 / EMC ME5024 VMware clusters first and ran staged weekend migrations with rollback checkpoints.
Instrument-to-Server Connectivity Failure Under New Firewall Rules
Mapped legacy lab-device traffic flows in advance and staged Palo Alto policies in monitor mode before enforcing VLAN segmentation.
Confidential Certification Data Exposure on 37 Retired HP Servers
Enforced serial-level drive tracking, sealed chain-of-custody removal, and certified ITAD data destruction in both Shanghai and Hong Kong.
Schedule Drift Across Two Jurisdictions Over a Two-Year M&A Rollout
Governed Shanghai (via BROCENT Group affiliates) and Hong Kong under one Brocent PMO with milestone UAT sign-offs from Feb 2021 to Apr 2023.
05 · RESPONSIBILITY, DELIVERABLES & SPECS
Clear split between Brocent and client IT
BROCENT HK & BROCENT GROUP AFFILIATES HANDLE
- DELL R750 server, EMC ME5024 storage & VMware virtualisation design and build (Shanghai via BROCENT Group affiliates)
- Cisco network switching & Palo Alto firewall configuration across Shanghai and Hong Kong
- Phased lab data migration, EUC migration & weekend cutover verification
- Physical decommission of 37 legacy HP servers & certified ITAD data destruction
CLIENT GLOBAL IT & LAB OPERATIONS RETAIN
- Lab software (LIMS) application testing sign-off & certification compliance rules
- Approval of weekend migration windows & Palo Alto firewall security policies
- Ownership of DELL/EMC/Cisco/Palo Alto hardware assets & VMware licences
- Final acceptance of migration UAT and ITAD destruction certificates
DOCUMENTS & AUDIT RECORDS HANDED OVER
ENVIRONMENT & CONTRACT SUMMARY
- Location / Facility
- Shanghai & Hong Kong
- Scenario
- DELL/EMC/VMware Lab Infrastructure & ITAD
- Timeframe
- Feb 2021 – Apr 2023
- Delivery Model
- Brocent HK engineering + Shanghai lab delivery via BROCENT Group affiliates
- Contracting Entity
- Brocent Hong Kong / Singapore HQ (HKD / SGD / USD; Mainland China delivered locally via BROCENT Group affiliates)
06 · MEASURED RESULTS & OUTCOMES
Before vs. after operational impact
“Consolidating 37 ageing HP servers across our acquired Shanghai and Hong Kong laboratories onto DELL R750, EMC ME5024, and VMware—and closing out with certified ITAD destruction—gave us a clean, secure lab foundation with zero testing downtime.”
INCLUDED IN SCOPE
PLANNING A SIMILAR PROJECT?
Lab Server/Storage Build, VMware Migration & Certified ITAD · CN & HK
Share your target cities, headcount, and timeline for a scoped SLA and transparent rate card.
EXECUTIVE BRIEF · 2-PAGE A4 PDF
Unlock the 2-page Executive Brief PDF
Read the complete interactive case study on this page, or enter your business details below to immediately unlock the formatted 2-page A4 PDF for offline boardroom sharing.
Your PDF is ready to download
Click below to save the A4 PDF to your device.
Global Textile Certification Organisation — DELL R750 / EMC ME5024 / VMware Lab Build, Migration & 37-Server ITAD Across Shanghai & Hong Kong
07 · FREQUENTLY ASKED QUESTIONS
Key technical & commercial questions before starting
What hardware and virtualisation stack replaced the 37 legacy HP servers?
Brocent deployed DELL PowerEdge R750 servers, EMC PowerVault ME5024 shared storage, VMware virtualisation clusters, Cisco switches, and Palo Alto firewalls across both Shanghai and Hong Kong.
How did you deliver Shanghai onsite work alongside Hong Kong?
Brocent Hong Kong led overall governance and Hong Kong delivery, while Shanghai laboratory installation, migration, decommissioning, and ITAD logistics were executed locally via BROCENT Group affiliate entities.
How was data security guaranteed when retiring the 37 legacy HP servers?
Every retired server and drive was serial-tracked from unrack through certified ITAD data destruction, issuing formal audit certificates confirming zero residual data.
Did the migration cover both backend servers and lab EUC users?
Yes. Alongside server and storage data migration onto VMware, Brocent completed regional EUC workstation migration and Palo Alto/Cisco network cutover across both sites.