B BROCENT Get a quote
Executive Brief 2 pages · Case studies

Executive Brief: Germany-Based Industrial Manufacturer — 14-Month Multi-Site Campus Data Centre Build & SIEM Across China & Hong Kong

End-to-end IT architecture design (HLD & LLD), 14-month campus data centre construction, structured cabling, wireless simulation, power estimation, cybersecurity/SIEM deployment, and hybrid cloud integration across Shanghai, Beijing, Guangzhou, and Hong Kong using Aruba, Cisco, Barracuda, APC, and HPE. Includes multi-zone architecture diagram, acceptance matrix (4 Sites SH · BJ · GZ · HK Campuses), and technical review by L.J. Yu.

Executive Brief: Germany-Based Industrial Manufacturer — 14-Month Multi-Site Campus Data Centre Build & SIEM Across China & Hong Kong

EXECUTIVE BRIEF · 2-PAGE A4 PDF

Unlock the 2-page Executive Brief PDF

Read the complete interactive case study on this page, or enter your business details below to immediately unlock the formatted 2-page A4 PDF for offline boardroom sharing.

Prefer to read online first? The full interactive case study is open with no form required: Read the full interactive case study dossier (architecture, matrix & FAQ) →