IT relocation
October 19, 2026 | 12 min
Server Relocation Services: Checklist, Downtime & Cost (2026)
A practical guide to server relocation for Hong Kong and Singapore companies: discovery and dependency mapping, a T-30 to T+1 checklist, cold move vs staged vs cloud migration, transport and insurance, cost drivers and data centre access rules.
September 29, 2026 | 18 min
Twelve Racks, One Weekend: A Hong Kong Rack Migration Runbook
For a group IT manager at a Hong Kong-headquartered manufacturer facing a lease deadline, moving twelve rack servers, a firewall pair, switches and a small SAN out of a landlord's building server room into a commercial facility with two provisioned 42U cabinets. Not the strategic guide to deciding whether and where to relocate a data centre — this is the move-night runbook itself: the pre-move survey, labelling and cabinet-mapping discipline, de-rack order, packing and transport, re-rack and power-on sequencing, the rollback point, and what out-of-hours physical work actually costs to arrange. Illustrative composite scenario; no Hong Kong facility operator is named as origin or destination.